    Corrigendum: Design, Supply, Manufacturing, Factory Inspection, Transportation, Erection, Testing and Commissioning of 1×6.3 MVA, 66/11 KV Power Transformer bay at Palam Substation and laying/erection of 11 KV Double Circuit HT Line from ongoing 66/11 KV Sub Station Palam Leh to KBR Airport Terminal Leh.

    Title Description Start Date End Date File
    Corrigendum: Design, Supply, Manufacturing, Factory Inspection, Transportation, Erection, Testing and Commissioning of 1×6.3 MVA, 66/11 KV Power Transformer bay at Palam Substation and laying/erection of 11 KV Double Circuit HT Line from ongoing 66/11 KV Sub Station Palam Leh to KBR Airport Terminal Leh.

    Design, Supply, Manufacturing, Factory Inspection, Transportation, Erection, Testing and Commissioning of 1×6.3 MVA, 66/11 KV Power Transformer bay at Palam Substation and laying/erection of 11 KV Double Circuit HT Line from ongoing 66/11 KV Sub Station Palam Leh to KBR Airport Terminal Leh.

    31/01/2022 28/02/2022 View (485 KB)