Close

    Notification:-supply and fixing of electricity cable for connection of Dual solar Bore well with the Grid supply from Administrative Block.

    Title Description Start Date End Date File
    Notification:-supply and fixing of electricity cable for connection of Dual solar Bore well with the Grid supply from Administrative Block.

    Notification:-supply and fixing of electricity cable for connection of Dual solar Bore well with the Grid supply from Administrative Block.

    12/08/2025 25/08/2025 View (2 MB)